New boiler left the workshops of STEIN ENERGY, subsidiary of the AIT-STEIN GROUP

Rueil-Malmaison, 03 November, 2016

In the early hours of the 18th of October 2016, an exceptional convoy of almost 30 meters in length left the workshops of the company STEIN ENERGY, located in Cernay, subsidiary of the AIT-STEIN GROUP, specialized in the conception, manufacture and marketing of industrial steam generators.

This water-tube recovery boiler will join in the Alpes-de-Haute-Provence department, the pharmaceutical site for which it is destined.

This enormous boiler of almost 80 metric tons has the following dimensions: 20 meters long, 5.5 meters wide, and 3.5 meters high.

It is destined to recover the heat from production waste gases in order to feed the site’s process and provide required heating.

The exceptional convoy, accompanied by two vehicles and motorcyclists specialized in convoy guidance, arrived on site on the 26th of October 2016 where two 700-ton and 150-ton-cranes will operate the installation.

The Erection phase on site will last four to five months, followed by a two-month Commissioning phase.

boiler-stein-18102016

 

(Newspaper L’Alsace, press release.communique-presse-lalsace

° ° ° °

AIT-STEIN GROUP is the European market leader for energy recovery, heat exchange and rotating machine cooling.

We are equipped to solve the most complex problems in terms of heat exchange and to handle thermal and mechanical design of these equipments or more advanced systems.

Our group has already installed over 35,000 operational equipment systems in 120 countries since its creation in 1928.

contact@aitgroup.fr

+33 (0) 1 70 38 68 00

Follow us:

LinkedInViadeo