Category Archives: 2019

AIT-STEIN GROUP & The “étoile verte”: urban integration project for the Saint-Ouen incineration plant

Rueil-Malmaison, 25 april 2019 Today the Syctom incineration centre with energy recovery in Saint-Ouen-sur-Seine is at the centre of an ambitious project aiming to optimise flue gas treatment and modernise the structural architecture of the industrial site. The site is equipped with three processing lines, renovated one after the other. Close to 200 M€ will

Continue Reading →

AIT-STEIN GROUP supports energy transformation of the household waste incineration plant in Sausheim

Rueil-Malmaison, 10 april 2019 The Sausheim EFW plant has been the scene of spectacular work with the implementation of a waste heat recovery loop manufactured by AIT-STEIN GROUP to recover and optimise the energy from two household waste incineration lines. This recovery loop includes: two economisers (one per line), four heat exchangers including two air

Continue Reading →

AIT-STEIN GROUP aims to reduce environmental footprint

Rueil-Malmaison, 03 april 2019 AIT-STEIN GROUP has been awarded a new contract for the design, manufacture and delivery of two oil boilers and two heat recuperators for a future sludge water treatment and recovery plant in Romania. AIT-STEIN GROUP oil boiler AIT-STEIN GROUP heat recuperator   Romania, as a member state of the EU, must

Continue Reading →